WALVIS BAY DIVING & SALVAGE 

WBD JPG.png
  • Home

  • About Us

  • Services

  • HBOT Chamber

  • Projects

  • Apparel

  • Contact

  • More

    Use tab to navigate through the menu items.

    PROJECTS

    A few of the projects we have completed successfully over the years. 

    Ingwenya: wet welding bow patch after collision
    Ingwenya: wet welding bow patch after collision
    2005
    Zula: Salvage and re-float
    Zula: Salvage and re-float
    2006
    WC O’Malley: 330Ton stern frame test
    WC O’Malley: 330Ton stern frame test
    2006
    Holmatindur: Salvage and re-float.
    Holmatindur: Salvage and re-float.
    2008
    Cyndan: Salvage and re-float
    Cyndan: Salvage and re-float
    2008
    Kolmanskop: Wreck removal
    Kolmanskop: Wreck removal
    2008 - 2009
    West Menang: Drill tender UWILD
    West Menang: Drill tender UWILD
    2009
    Petrobras 10 000: Transocean Drill rig inspection and anode
    Petrobras 10 000: Transocean Drill rig inspection and anode
    2010
    NP Glory 4: Remove bow thruster grating and unit for repairs
    NP Glory 4: Remove bow thruster grating and unit for repairs
    2014 - 2015
    Tamika: Salvage and re-float
    Tamika: Salvage and re-float
    2016
    South West Eagle: Cut and scrapped
    South West Eagle: Cut and scrapped
    2017
    NAMWATER : Katima River Pump Tower
    NAMWATER : Katima River Pump Tower
    2019
    Maersk Voyager: Prepare and execute ABS UWILD with surveyor
    Maersk Voyager: Prepare and execute ABS UWILD with surveyor
    2019
    Jupiter 1: Resecure 20T rudder with unique designed bolts
    Jupiter 1: Resecure 20T rudder with unique designed bolts
    2019 - 2021
    Fisher Bank: Resecure 10T rudder.
    Fisher Bank: Resecure 10T rudder.
    2020

    © 2021 by Mad Hatter Digital 

    • Facebook
    • LinkedIn